0755-28152581
服务热线
让你低调出众 | 注塑模具专业英语随口说

注塑汇

国内专注注塑业咨询培训服务,致力于注塑业的降本增效

疫情以后,注塑行业向何处走?


(一)模具专业基本用词  Professional Terms 


1.塑料  — plastic, resin 

2.样件  — sample 

3.钢料  — steel 

4.注塑机  — injection machine, press 

5. 产品  — part, product, moulding 

6.模具  — mold, mould, tool 

A 简易模(样板模)— prototype mold          

B 量产用模具  — production mold 


7.三维造型(数模)—3D model, 3D data 

8.二维产品图  — 2D part drawing 

9.设计  — design 

10.制造  — manufacture, build up, construction, fabrication, make 

11.检验  — check, inspection 

12.测量  — measure, inspection 

13.修改  — change, modify, correction 

14.工程更改  — engineer change 

15.质量  — quality 

16.数量  — quantity 

17.基准  — datum, reference 


(二)如何解析2D 产品图?How to read 2D part drawing? 



一. 产品几何  Geometry 


1.点  — point 

2.线(边)  — line, edge 

3.面  face 

A 侧面  — side            

B 表面  — surface            

C 外观面  — appearance surface 


4.壁厚  — wall thickness, stock thickness 

5.加强筋(骨位)  — rib 

6.孔  — hole 

7.细长的槽  — slot 

8.柱位  — boss 

9.角  — corner 

A 圆角  — fillet                

B  倒角  — chamfer                

C 尖角  — sharp corner 

10.斜度  — angle, taper 

11. 凹槽—recess , groove 


二.  分模信息  Splitting 


1.  分型线  — parting line (P/L), splitting line 

2.  主分模方向  — main direction, line of draw 

3.  浇口设定  — gating 


一. 产品标识  Part Identification 

1.  产品名称  — part name (P/N) 

2.  产品编号+版本号  — part number + revision (Rev.) 

3.  型腔号  — cavity number 

 

4.  材料标记  — material symbol 

5.  模具编号  — mold number (no.) 

6.  日期印  — dating insert, date code 

7.  循环印  — cycling code 

8.  公司标志  — company logo


二. 技术要求  Specification (Special Requirement) 


1.  项目启动表  Kick-off sheet 

1)  项目名称  — program name, project name 

2)  产品名称  — part name, product name, part description 

3)  产品编号  — part number (P/N) 

4)  客户模号  — customer mold no. 

5)  项目启动日期  — kick off date, start date 

6)  项目完成日期  — due date, lead time 

7)  内模件用钢  — tool steel 

8)  型腔数量  — number of cavities 

9)  数据文件编号  — data file no. 

10) 注塑材料  — resin, plastic, raw material  

11) 收缩率  — shrink, shrinkage, shrink factor 

12) 注塑机吨位  — molding machine size, injection machine size 

13) 成型周期  — cycle time 

14) 型腔光洁度  — cavity polish 

15) 型芯光洁度  — core polish 

16) 皮纹(晒纹)— texture, grain 

17) 拔模斜度  — draft angle, removal taper 

18) 注塑件颜色及光泽  — molded color & gloss 

19) 模具加工地  — manufacturing facility 

20) 热流道供应商  — manifold manufacturer, manifold supplier 

21) 浇口位置  — gate location / position 

22) 浇口类型  — gate type 

产品标识  — stamp information, part identification 

特殊要求  — special instructions 



1.  产品质量及外观要求  Part Quality & Appearance Requirement 


1)  尺寸及公差  Dimension & Tolerance 


① 重要尺寸  — critical dimension, important dim., key dim. 

② 理论尺寸  — nominal dimension 

③ 实际尺寸  — actual dimension 

④ 公差  — tolerance 

⑤ 公差带  — tolerance range 

⑥  尺寸超差  — dimension deviation 

⑦  接受(合格)  — accept, OK 

⑧  拒绝(不合格)  — reject, refuse, obsolete, NG 

⑨  让步接受  — concession, special admit 

⑩  返工  — re-work 


2)  产品缺陷(常见的)Defects (normal) 

 

①    缩水  — sink mark, shrinkage 

②    飞边,毛边  — flash, burr 

③    段差  — mismatch discrepancy 

④    银丝纹,蛇纹  — snake marks, streak 

⑤    弯曲,变形  — warpage, distortion 

⑥    打不饱(缺料)  — short shot 

⑦    熔接线  — weld line 

⑧    多胶— unwanted plastic  

⑨    拉伤—damage 

2.  产品外观  Part Appearance 

①    产品颜色  — part color 

②    产品光泽  — gloss 

③    皮纹粒度  — grain 


3.  常用词汇、词组及短语  Normal Word, Short Sentence 


1)  单边  — per side 

2)  双边  — both sides 

3)  加入,添加  — add, incorporate 

4)  去除,取消  — remove, cancel 

5)  满足…的要求,符合,与…要求一致  — according to, conform to, satisfy, meet 

6)  要求,需要  — require, need, demand 

7)  确认  — be approved, agreed by … 

8)  允许  — permit, allow  

9)  在…范围之内  — within 

10)  不可以,不允许,禁止  — free from, prevent, avoid 

11)  …,除非有另指  — … unless otherwise specified 

12)  …或少于  — …or less 

13)  自动化运作  — automatic operation 


14)  未注尺寸(详细形状)见三维造型   

        Non dimensioned contour (detailed shape) see 3D model. 

15)  分型线上的飞边(披缝)或段差应小于…  

         Burrs or discrepancy on the P/L shall be … or less. 


标题栏  Title Block 


1.  产品名称  — part name 

2.  图纸编号  + 版本号(索引号)— drawing no. + level (index) 

3.  一般公差  — general tolerance 


(三)  如何阅读制模标准?How to read tooling standard?


一.模具结构术语  Mold Construction Terms 


A.模架  Mold Base 

1.  模架量化特征  Measurement Feature 

①  长  X 宽  X 高  — Length X Width X Height 

②  模具高度尺寸(模厚)  — stack height of mould 

③  模具重量  — total weight of mould, mould thickness 


2.  定模底板  — front plate, top clamping plate, clamp plate, clamping plate 

3.  定模板  — cavity plate, fixed mould plate, A – plate 

4.  动模板  — core plate, moving mould plate, B – plate  

5.  支撑板  — support plate, backing plate 

6.  间隔板,方铁  — support blocks, rails, risers, spacer block 

7.  顶杆固定板  — retaining plate, ejector retaining plate 

8.  顶板  — ejector plate,bottom clamping plate 

9.  动模底板  — back plate 


10.导柱  — guide pillar, leader pin, guide pin 

11.导套  — guide bush, leader pin bush 

12.复位杆  — return pin, push-back pin 

13.弹簧  — spring 

14.撑头  — support pillar 

15.顶针板导柱、导套  — ejection guide pin / bush 

16.垃圾钉  — stop pin, stop button 

17. 模脚  — standing-off pillars 

18. 标牌  — plaque scutcheon 


B.成型零部件  moulding components 

1.  型芯  — core insert 

2.  型腔  — cavity insert 

3.  镶针  — core pin 

4.  镶块  — sub-insert, split 

5.  滑块  — slide, sliding split 

6.  斜顶  — lifter, angled-lift split, loose core 

A 斜顶头  — lifter head                            

B  斜顶杆  — lifter rod, lifter shaft 


7.  成型顶杆  — moulding face pin, form pin 

C.浇注系统  Feed System 

1.塑料  Moulding 

a.主流道  — sprue 

b.分流道  runner 

①  主分流道  — main runner                     

②  二级分流道  — branch runner 

分流道断面形状  cross-sectional shape of runner 


①  圆形  — full round      

②  半圆形  — semicircular      

③  梯形  —      trapezoidal 


c.浇口  gate 

常用浇口形式  normal gate type : 

①  边缘浇口(J型浇口)  — edge gate, J – gate 

②  侧浇口  — side gate 

③  潜伏式浇口  — sub-gate, subsurface gate, submarine gate, cashew gate 

④  潜伏式二次浇口(隧道式浇口) — tunnel gate onto feeder post 

⑤  点浇口  — pin gate 

⑥  直接浇口(主流道型浇口) — sprue gate, direct gate 

⑦  护耳式浇口  — tab gate 


d.模腔  — impression  

e.  冷料井  — cold slug well 

f.  热流道  — hot runner 

2.模具零件  mold components 

a.定位圈  — locating ring, location ring, register ring   

b.浇口套  — sprue bush 

c.挡圈  — stop ring 

d.浇口镶块  — gate insert 

e.热流道板  — manifold 

f. 热嘴  — hot drop\hot sprue    


分型面及其锁紧、排气  Parting Surface, inter-locking & venting 

1. 分型线  — parting line ( P/L ) 

2. 镶拼线  — bodyline, joint line 

3. 平  /  不平的分型面  — flat / non – flat parting surface 

4. 封胶面  — shut off surfaces, seal-off surfaces 

5. 擦穿位  — shut off 

6. 碰穿位  — kiss-off 

7. 管位  — parting line lock 

8. 分型面的释放(避空) — relief of parting surface 

9. 分型面的平衡  — balancing of parting surface 

10.锁紧角度  — locking angle 

11.锁紧力  — clamping force 

12.锁模块  — safety strap 

13.精定位  — Interlock, die lock 

14.困气  — air trap 

15.排气槽  — vent, vent slot 


E.滑块机构  Slide 

1.驱动  Actuation 

①  斜导柱  — angle pin, horn pin, cam pin 

②  弹簧  — spring 

③  油缸  — hydraulic cylinder  


2.制动  Detention 

①  滑块固定器  — slide retainer 

②  弹簧制动器  — spring-loaded detention (plunger) 

③  挡钉、挡板  — stop pin, stop plate, slide stop 


3.导轨  — gib, guide strip 

4.锁紧块(楔紧块)— heel block, locking heel, wedge block, chase block 

5.耐磨片  — wear plate, wear strip 

6.压板  — retainer, gib 

7.螺钉  — screw 

8.定位销  — dowel pin 


F.斜顶机构  Lifter 

1.斜顶头  — lifter head 

2.斜顶杆  — lifter rod, lifter shaft 

3.开口销  — split pin  

4.固定板(压板)  — retainer plate 

5.耐磨片  — wear plate  

6.铜导套  — bronze bushing 

7.衬套  — spacer 

8.导轨  — L – gib  

9.滑动块  — slide 


G.顶出系统  Ejection System 

1.基本词汇  Basic Word 

① 顶出行程  — ejection stroke 

② 模具开档  — daylight 

③ 粘模  — stick 

④ 产品脱模  — part is push off from, clear part of mould, separation of part 


2.顶板机构  Ejector plate assembly 

①  顶板  — ejector plate 

②  顶板固定板  — retaining plate 

③  推板— stripper plate 

④  推板导柱  — ejector guide pin 

⑤  推板导套  — ejector guide bush 

⑥  撑头  — support pillar 


3.复位机构  Return System 

①  复位杆(回程杆)— return pin, push – back pin 

②  垃圾钉  — stop pin, stop button 

③  压簧  — compressed spring 

④  碟簧  — a stack of ―Belleville‖ washers 

⑤  早复位机构  — early return system 

⑥  强制复位机构  — positive return system 


4.顶出方法  Ejection Techniques 

1)顶杆顶出  — pin ejection 

2)顶管顶出  — sleeve ejection 

3)顶块顶出  — bar ejection 

4)扁顶顶出  — blade ejection 

5)顶板顶出  — stripper ejection 

6)油缸顶出  — hydraulic ejection 

7)气顶  — air ejection 

8)阀门顶出  — valve ejection 


5.顶出元件  Ejection Elements 

1)拉料杆  — sprue puller, sucker pin 

2)顶杆  — ejector pin 

3) 阶梯式顶杆  — stepped ejector pin  


1)顶管  — ejection sleeve, sleeve 

2)扁顶  — ejector blade, slabbed off ejector pin 

3)顶块  — stripper bar 

4)顶环  — stripper ring 

5)推板  — stripper plate 

6)加速顶  — accelerated ejection 


1.顶出辅助机构  Supplementary operating system 

1)弹簧柱塞器  — spring – loaded plunger 

2)弹珠定位器  — ball catch system 

3)插销式锁扣  — Latch – lock   

4)尼龙拉杆装置  — friction puller device 


2.电器元件  Electric Components 

1)压力传感器  — pressure transducer 

2)限位开关  — limit switch 

F.冷却系统  Cooling System 


1.基本词汇  Basic Word 

1)温差  — temperature variation 

2)水孔(水道)  — waterlines, water-ways, flow-way, channel 

3)水路  — cooling circuit 

4)水路示意图  — water schematic, schematic circuit 

5)冷却液  — coolant, coolant fluid 

6)内连接  — interconnect 

7)外连接  — external connection 

8)出口、入口  — outlet、inlet 

9)漏水  — water leakage 


2.水路分布  Circuits 

1)阶梯式水路  — stepped system 

2)分隔板水路  — baffled hole system 

3)斜孔式水路  — angled hole system 


3.  水路元件  Components 

1)  闷头(螺塞、止水栓)  —  (threadless)brass pressure plug : female plug & male   

2)  隔水片  — baffle 

3)  密封圈  — O – ring  

4)  快插水路接头  — quick disconnect fitting, quick connection adaptor 

5)  弯头  — elbow 

6)  偶合器(连接器、接头)  — adaptor (including a plug & a socket) 

7)  橡皮管  — rubber hose 

 

1)  分水板,集水块  — water manifold 

G.螺纹、螺纹孔  & 螺钉  Thread, thread hole & screw 

1.  螺纹  — thread 

2.  管螺纹  — pipe thread 

3.  螺纹孔  — screw hole, tapped hole 

4.  起吊孔  — handling hole, jack screw hole, eye bolt hole 

5.  螺钉  — screw 

6.  内六角螺钉  — socket headed cap screw (s.h.c.s.) 

7.  沉头螺钉  — flat headed cap screw (f.h.c.s) 

8.  螺栓  — bolt 

9.  螺母  — nut 

10.锁紧螺母  — locknut 

11. 螺纹标准  Thread Standard 

①  公制标准  — Metric 

②  英制标准  — Imperial 

③  英制管螺纹标准  — British Standard Pipe thread (BSP) 

④  美制管螺纹标准  — NPT 

⑤  美制粗螺纹标准  — United Coarse thread (UNC) 

⑥  美制细螺纹标准  — United Fine thread (UNF) 


H.润滑  Lubrication 

1.  润滑槽  — grease groove 

2.  加油管  — grease line 

3.  油杯  — lubrication fitting 


I.  测量仪器  Measuring Instruments 

1.游标卡尺  — vernier caliper 

2.千分尺  — micrometer 

3.高度规  — height gauge 

4.刻度规  — dial gauge 

5.三坐标测量仪(三次元)  — Coordinate Measure Machine(CMM) 

6.塞规  — pin gauge 

7.圆角量规  — radii gauge 

8.轮廓投影机—profile projector 


J.注塑机参数  Injection Machine Parameter 

1.注塑机规格参数  Injection Machine Specification 

①  锁紧类型  clamp type 

a.油缸  — hydraulic                          

b.肘杆式  — toggle 

②  垂直注塑机导柱间距  — tie bar vertical clearance 

③  水平注塑机导柱间距  — tie bar horizontal clearance 

④  台板尺寸  — platen dim. 

⑤  最小  /  最大模厚  — mold height Min. / Max., Min. / Max. mold thickness 

⑥  最小  /  最大注塑机开档  — open daylight Min. / Max. 

⑦  锁紧行程  — clamp stroke 

⑧  锁紧力  — clamping force 

⑨  顶出行程  — ejector stroke 

⑩  顶出力  — ejector force 


● 杨建宏谈注塑 | 注塑生产中,有披锋缺陷为何不能加锁模力?

● 杨建宏谈注塑 | 注塑机市场逆势增长下的隐忧

● 杨建宏 | 注塑机不合模的原因分析

● 杨建宏 | RCEP时代注塑行业的对策

我们为注塑企业提供服务

深圳振业企业管理咨询有公司服务宗旨:为注塑企业推广科学注塑、精益注塑的理念,推动注塑企业技术及管理的合理化、简单化、标准化。建立“高效、稳健、低成本、快反应”的工厂运作体系。提高生产效率,降低注塑制造过程中的变异,降低成本,缩短订单反应时间,减少现金流占用,最终增强注塑企业综合的竞争力!

--- THE END ---

振业注塑  zy-plas

振业注塑|专注于塑料行业服务

免费咨询:0755-28152581 / TEL:181 2642 3515

齐心抗疫
与你同在